Arcadis

Hydroland supported Arcadis (Hyder Consulting Ltd) by providing a training course and a senior modeller service for wide range of projects since 2013.

Projects and training:

  • Training: Hydroland delivered short course for Hyder ISIS2D in 2013 for canal breach analysis.

 

  • Training: Hydroland delivered for Arcadis (India, Bengaluru office) in March 2016 Food Modeller 1D_2D, TUFLOW_ESTRY, TUFLOW _ Flood Modeller 1D. course material include coastal tidal Interface 2D modelling in Flood Modeller 2D, Dam break and inundation in Flood Modeller 2D, Direct Rainfall application In Flood Modeller 2D, 1D_2D linked modelling using ISIS_TUFLOW and Flood Modeller 1D_2D.

 

  • Modelling and Designing: Hydroland supported Arcadis by building and optimising hydraulic model for Foulridge Reservoir analysis for CRT based on the new 4th Edition Flood and Reservoir safety Guide.

 

  • Modelling: Hydroland supported Arcadis in the final stage of Willow brook hydraulic assessment. Persimmon Homes commissioned Arcadis Consulting (UK) Ltd to undertake an assessment of the flood risk associated with constructing a new road crossing on the Willow Brook, Weldon, Northamptonshire. The new road crossing is part of a wider mixed use Weldon Park urban extension development on the eastern edge of Weldon involving up to 1000 dwellings.